Skip to main content

West Sweetwater Springs Road Project

Dates: April - July 2025

Vegetation management along Sweetwater Springs Road between 4900 Sweetwater Springs Road and Armstrong Woods Road. Treatment was performed up to 30 feet from the edge of the pavement where property owner consent was obtained. Cut material was chipped with chips left onsite. The project was in partnership with CAL FIRE.

A winding path surrounded by trees and dappled sunlight, set in a forested area.
West Sweetwater Springs Road
Join our mailing list