West Sweetwater Springs Road Project
Dates: April - July 2025
Vegetation management along Sweetwater Springs Road between 4900 Sweetwater Springs Road and Armstrong Woods Road. Treatment was performed up to 30 feet from the edge of the pavement where property owner consent was obtained. Cut material was chipped with chips left onsite. The project was in partnership with CAL FIRE.
West Sweetwater Springs Road
