Fuel Reduction Projects / Bidding Information
CURRENT REQUEST FOR PROPOSALS
Project Name: Vineyard Club Hazard Trees 4
Project Description: Cutting and removal of standing trees; Removal of tree trunks that have been left from previous tree cutting projects
Bid Proposal Due Date: 5:00 PM on Wednesday October 4, 2023
Supporting Materials:
Project MapRequest for ProposalsPicture Package
Project Name: DR4482-PJ0587
Project Description: Professional planning and management services for Vegetation Management Projects in support of a Strategic Control Network in the Cloverdale Fire Protection District
Bid Proposal Date: 4: 00 PM on Thursday September 28, 2023
Supporting Materials:
RFP_Cloverdale_CWPP_Grant_DR4482_PJ0587_FINAL.pdf
Project Name: LSW Strategic Control Line Network Phase 2, Las Lomas/Tombs Creek Rd
Project Description: Create a shaded fuel break to limit or modify potential fire movement along and across the site, including removal or modification of existing vegetation to improve access for firefighting and to serve as a control line for future wide area vegetation treatments such as prescribed burning.
Bid Proposal Date: 4:00 PM Thursday, September 28, 2023
Supporting Materials:
2023-08-08-LTC-2-bid package.pdfRecently Bid Projects
Project Name | Description | Bid Winner |
---|---|---|
Vineyard Club Hazard Trees Phase 2 | Cutting and removal of standing trees. Removal of trunks that have been left from previous tree cutting projects or fallen naturally. | Image Tree Service |
Vineyard Club Hazard Trees Phase 1 | Cutting and removal of standing trees. Removal of trunks that have been left from previous tree cutting projects or fallen naturally. | Atlas Tree Surgery |
Gualala/Russian River Watershed Ridge Shaded Fuel Break Phase 1 | Shaded Fuel Break along portions of the Gualala/Russian River Watershed Divide located west of Lake Sonoma. | Schmidt Land Management |